Projects:

  • Walden Park Furniture Replacement: LARMAC is taking a look at furniture at parks and pocket parks to determine what has reached the end of its useful life. If it has, the furniture is replaced.  
  • Bird Spike Installation: The Board of Directors has approved the installation of bird deterrents to prevent birds from perching atop certain light poles in order to reduce maintenance costs. 
  • Covenant Hills Clubhouse Outdoor Benches Refinish: The outdoor benches that overlook the lawn at Covenant Hills Clubhouse have been refinished just in time for summer. 
  • Bocce Ball Scoreboard Installation: A scoreboard has been installed, making it easy for players to keep tabs.
  • Leak Repairs at Terramor Aquatic Park: LARMAC's vendor identified leaks at the water park and splash pad, and repairs are expected to be completed by the end of May. 
  • Linear Park and Oak Knoll Village Clubhouse Rubber Play Surface Replacement: Five parks are currently underway to have the rubber play surface replaced. 
  • Trail Repairs: The trails took a beating this year with the extensive rains that we experienced. LARMAC and its vendors have been diligently working on trail repairs. 
  • AED Units: Each of the four clubhouses has Automated External Defibrillator (AED) units installed. 
  • Mailbox Replacement Project: Mailboxes in some front yard special benefit areas (FYSBA) are being replaced. 
  • Trellis Rebuild and Replacement at Mission Hills Park: After one trellis experienced a partial collapse, LARMAC demolished, rebuilt, and replaced it. 
  • Gazebo Replacement at Town Green: The peak of the gazebo had to be rebuilt, and the footings were replaced and set on concrete. 
  • Cox Sports Park Picnic Area: LARMAC now manages reservations for the picnic area at Cox Sports Park, which has been added to LaderaLife.com/Reservations. 
  • Vandalism: On a quarterly basis, the patrol company reports on vandalism. There were 28 reports filed from March 24 to May 1, 2023.
  • Landscape and Irrigation: Every other month, O'Connell Landscape and Mosaic Consulting report on their respective areas. On Arbor Day (April 28), O'Connell installed Ash trees at Founders Park.
  • Landscape-Acacia Removal: Acacia shrubs were removed to create a clearing for the 13-hole.
  • Landscape Renovation-Covenant Hills Cul de Sacs: Completed in conjunction with some asphalt replacement, the purpose of this project was to reduce water run-off onto the asphalt and reduce costs. The sprinklers were converted to drip irrigation, and plants were installed.
  • Landscape-Fuel Modification: This is an ongoing project throughout Ladera Ranch. O'Connell has been hard at work with this major effort to ensure that LARMAC is in compiance with OCFA standards.
  • Tree Maintenance-Palm Tree Skinning: Palm trees were maintained along Sellas. Before and after photos are included.
  • Irrigation Breakdown: Fun facts about irrigating Ladera Ranch are included some were highlighted in the summer issue of Roots and Wings magazine (see page 16).

LARMAC invited residents to attend all open session board meetings held monthly.